Daily maintenance of the boiler
5, ventilation system, including the blast, induced draft fan, adjust the door and the opening of the gate, ventilation pipes and other state is good.
4, fuel combustion systems, including the fuel reserves, transmission lines, combustion equipment, ignition equipment, fuel cut off devices, pumps and other conditions are in line with the requirements.
3, water supply system, including the water tank water level, water temperature, water treatment equipment, etc. whether the symbol requirements.
2, automatic control system, including the flame detector, water level, water temperature detection, alarm devices and a variety of interlock devices, display control system (see below) and other performance status is to meet the requirements.
Pressure gauge, water level table (see below), safety valve, sewage device, water supply valve, steam valve, check whether its performance meets the requirements, other valve switch status is good.