Question:

Decoration construction measures the basis of the payline in the report line and the results of the release of the table how to fill?

The basis of the material and pay off the results of the table is how to fill in the format ah? Thank you more

Answer:

Next, the mapping team will give the construction side of some control points, usually the intersection of housing axis
In general, after the construction plan, Party will invite the surveying and mapping brigade to the construction side of a planning report, the above red line and the construction of red line, mapping team will put these lines will be released
The construction unit according to the surveying and mapping brigade to the point of inspection to confirm, and then lead to the protection of the place, generally not less than easy to check later After the site is flat, the construction unit will map the brigade requirements lofting out of the bit out (usually the intersection of housing axis) The mapping team will arrange the finishing points of the construction unit to sort and then report - the actual coordinates and the coordinates of the design coordinates In the allowable error within the scope of the inspection line is completed, the next step construction Personally think that those points completely unnecessary, direct test test out of the control point is not done, as long as the instrument and the surveyor no problem, so many tests are not in the control point? But the mapping unit is calculated by point, there are such a procedure, anyway, Divided into two: 'construction measurement line check-up table' in the line according to the material refers to the Surveying Institute to the project to provide the results of the report, sub-axis control point report (points less than 3 points) and 'construction measurement payout results table' refers to our own done 'floor plane pay line record', 'elevation copy record' and other measurement records; 'floor plane 1) Construction Drawing No 2) Measurement of construction plans and construction engineering survey procedures 3) The above-mentioned survey results provided by the Surveying Institute provide the axis control points in the report , And elevation control points;