Demolition of tunnel bearing formwork for several days

Demolition of tunnel bearing formwork for several days

Answer:

The removal time of concrete wall and beam column pouring template is determined according to the strength of concrete, different situations: different removal time of concrete strength of the bottom die and the bracket removal should meet the following requirements:
The average temperature of 20 degrees, can be removed for 28 days. High temperature removal time is short, low temperature stripping time longer.
With the temperature, the need for concrete strength of 100% to remove the template