Difference between diesel generator and gas turbine generator set
From the cold start to full load after the time is only 30 seconds, while the provisions of the diesel generator after the successful start of the load with a load of 3 minutes.
the performance of gas generator set is good, the success rate is high
The operation cost of gas generator sets is low: the new energy, turning waste into treasure and environmental protection and clean emission are becoming more and more popular