Does toilet water need to be done with white latex and cement first?
Toilet waterproof process flowThe treatment and cleaning of the base layer include the leveling layer, the bonding layer, the detail additional layer, the acrylic waterproof layer, the water storage test and the protective layer construction, and the two water storage test.1., the kitchen and bathroom should be checked correctly, and pay special attention to the elevation and position of the floor drain.On the 2. floor drain, pipe root hole wall quality should be carefully inspected, the hole in the wall to compacting qualified construction must be made when the leveling layer pipe root caulking treatment according to the requirements.3. Yin and yang angle should be made into the circular arc shape, and straight and flat.
Caisson type toilet construction method is like this: 1. sink the ground, first do two waterproof, one for rigidity, the second is flexible. A: and do 48 hours closed water test, B: at the bottom of the riser and toilet caisson bottom, open a circular hole with a diameter of 20 millimeters, insert the 20 diameter tube into the opening 4 mm depth. The center position of the drain pipe to toilet caisson, caisson is easy to install toilet waterproof, C: a protective layer on the waterproof coating on Water Leakage with cement mortar requirements around the high position of the lowest installed waterproof device of the body, the protective layer of cement mortar dry after ---2. installation, sewer pipe. Install the water proof main body and cover the pebbles on the body to ensure that the water in the caisson can be unobstructed, drain away from the vertical pipe and fill 3. sand mounds to 5 cm lower than the ground. 4. fill with cement. 5., and then do a good toilet threshold waterproof. 6. floor tile.
4. leveling layer construction: base surface has gaps, cracks, unequal defects, with cement mortar repair smooth. The base surface must be firm, level and clean, free from dust, grease, wax, mold release, and other debris.5. leveling layer drying can be carried out before the construction of waterproof layer, during construction should be fire, waterproof. Construction personnel should wear soft shoes.6. after the waterproof layer is finished, the finished product should be protected and not allowed to move about. After passing the inspection and confirmation, only after the acceptance of the hidden project has been carried out can the construction of the next working procedure be carried out.7. waterproof construction after the completion of the water storage test, after more than 24 hours without leakage, as qualified. Two water storage tests are carried out after the installation of the equipment is completed.