Computer usb interface plug U disk why there will be: hub port surge
Before pouring in concrete, pre-buried. If the concrete has been poured finished, then there is a chisel to open a trench buried on it.
Should be separated from the distance, because if the water pipe is broken, the dredging pipe will damage the cable, if the site restrictions, separated by brick, it will not appear the above situation.