Home > categories > Machinery & Equipment > Concrete Machinery > General steel and concrete mechanical bench production
Question:

General steel and concrete mechanical bench production

General steel and concrete mechanical bench production

Answer:

Heck, what do you mean by the production of steel and concrete machine? I'll take a look at it
General reinforced concrete machinery affecting yield = 1 h normal productivity on a pure pure working time = mechanical pure * working class work duration * * working class 1 h normal productivity mechanical normal utilization coefficient
Earthmoving machinery shift production: Single bucket excavator crab type model Capacity (m3) 0.2 Maximum depth of digging (m) Theoretical productivity The usual taiban production is 80-120m3 caterpillar Model W - 301 Bucket capacity of 0.3 The biggest dig deep (m) 2.6 (pit), 4 (ditch) Theoretical productivity: 72m3 / h The production is 150-250 tyred Type the W3-30 Bucket capacity of 0.3 Maximum depth (m) 4 in the backhoe Theory productivity 63m3 / h The production rate is 200 to 300 caterpillar W1-50 model Bucket capacity of 0.5 The biggest dig deep (m) 5.56 when the backhoe is on Theory productivity 120m3 / h The production is 250-350 caterpillar Type of W1-60 Bucket capacity of 0.6 Maximum depth (m) 5.2 Theory productivity 120m3 / h The production is 300 to 400 caterpillar Model W2-100 Bucket capacity of 1 Maximum depth (m) 5.0 for the backhoe Theoretical productivity 240m3 / h The production rate is 400 to 600 caterpillar Model W1-100 Bucket capacity of 1 Maximum depth (m) 6.5 Theoretical productivity 180m3 / h The production is 350-550

Share to: