Glazed brick wall grouting copper wire played what role?
Forehead...... This can refer to why the building should be built inside the reinforcement.
Construction methods of glazed tile: construction methods generally have dry shop, wet paste, dry hanging, wet hanging 41, dry shop: is the use of cement pulp in the ceramic tile backing, the following with about 1:3 of dry cement mortar leveling.2, wet paste: is the direct use of ordinary cement mortar bricks, now basically no wet paste, poor quality, easy detachment.3, dry hanging: is the side wall slotted plate, expansion screws hanging on the eye hit the angle beam and then do pendant on the stone open the seam in the pendant screw on the eyes to iron with marble glue placed pendant open front place glue.4, wet hanging: is the plate position (generally is to hit a nail nails copper wire is fixed at the other end of the stone board is generally two nails on the wall) and poured cement between the plate and the wall cracks.
The effect is that the copper brick, brick with copper wire and fixed on the wall; and hanging, hanging wet two, dry hanging is directly hang up, hang to dry hanging on wet after in the gap between the wall tiles and pouring cement.