Question:

Hanging basket construction and demolition of blue construction should meet the following requirements

nan

Answer:

(6) after assembling the basket, the installation quality should be checked, and the load test should be carried out in order to measure the deformation of the basket and eliminate the non elastic deformation. If the local deformation is too large in the pre pressing process, the load should be stopped immediately.(7) the removal of the hanging basket shall be removed in accordance with the requirements.
(4) for the increase in the basket on the facilities (such as anti canopy, cold shed, shaft frame etc.), must be on the overall stability of the hanging basket is checked, and shall not damage the hanging basket structure and change the stress form.(5) during the assembling process of the hanging basket, it is strictly prohibited to cut and enlarge the hole of the bolt at any time, and it is necessary to obtain the consent of the hanging basket design unit. It is strictly prohibited to carry out electric welding and fire on the steel bar of the finish rolling. All of the finished steel bars must be locked with double nuts.
(1) hanging basket and the use of machinery and equipment (such as Jack, chute, hand hoist, steel wire rope, etc.), should be checked, the use of unqualified prohibited.(2) the assembling of the hanging basket should be carried out symmetrically, and the components can be firmly connected in time to prevent the dumping.(3) hanging basket operation platform should be linked to the safety net, surrounded by a fence, up and down should have a special staircase.