Home > categories > Construction & Real Estate > Form Traveler > Hanging basket in the construction of the 2 block construction is also need to press it
Question:

Hanging basket in the construction of the 2 block construction is also need to press it

nan

Answer:

6 when you walk in the basket, be sure to move smoothly.7 cantilever pouring concrete should be from the basket to the front of the basket to the end of the basket.8 jack is an important tool in construction, must be carefully maintained.9 walking system should be lubricated regularly.
4 anchor bolts to be tightened by means of jack.5 the outer side of the mold at the anchor plate do not pack dead.6 when you walk in the basket, be sure to move smoothly.7 cantilever pouring concrete should be from the basket to the front of the basket to the end of the basket
The main points of hanging basket construction:1 the installation elevation of the hanging basket should be in strict accordance with the designed value.2 reserved holes shall be accurate and shall not be allowed to bend.3 the pre tension of the hanging basket should be set according to the design.
First, the height of the test results. In line with the requirements do not pre pressure, followed by hanging basket construction 0# block is the most important, pre pressure pouring. Down to the basket pre pressure, that is, 1# block, in the continuous beam hanging basket in addition to 0# block 1# is the most important, in the 1# pre pressure when the basket has been removed from the non elastic deformation, so no need to hang the basket that is 2# block pre pressure.

Share to: