Heating inverter commissioning steps
And carry on the test run 1. manual operation of the frequency converter panel running stop, observe the motor running process and the frequency converter display window, to see if there is abnormal phenomenon. 2. if the P is started and the over-current protection is stopped in the motor, the acceleration P deceleration time should be reset. The acceleration of the motor during acceleration and deceleration depends on the acceleration torque, while the frequency change rate of the inverter during the start and braking is set by the user. If the inertia of motor or motor load change, speed or deceleration rate according to frequency change preset when possible acceleration torque is not enough, resulting in motor stall, motor speed and the inverter output frequency coordination, thus causing overcurrent or overvoltage. Therefore, it is necessary to set acceleration and deceleration time according to the inertia and load of the motor, so that the frequency change rate of the converter can be coordinated with the speed change rate of the motor.
The no-load connection test of the frequency converter will connect the grounding terminal of the frequency converter to the ground 1. 2 the power input terminal of the frequency converter is connected to the power supply through the leakage protection switch. 3 check the frequency converter display window factory display is normal, if not correct, should reset, or request exchange. 4 familiar with the operation key of frequency converter. The inverter has run in general (RUN) and stop (STOP), programming (PROG), P (DATAPENTER), the data confirm the increased (UP, 3), reduce (DOWN, 6) and other key definitions of different inverter operation keys are basically the same. In addition, some inverters also monitor (MONITORPDISPLAY), reset (RESET), inch movement (JOG), shift (SHIFT) and other functional keys.