Brother for the first time to do such a large project, encountered problems, please help. I do weak engineering, and now the soil side to do the mine does not meet the standards, there is no drainage pipes to the sewage pipes, each rainwater wells, and then back into the stairs inside. I now want to do the pipeline block, afraid of blocking bad, afraid of injury line, which has done a similar block ah, what should be used to do blocking it? Thank you brother! The The More
Grooming mainly occurred in the upstairs leaking, the first should be clear state. One is to prove that they are not artificial to damage, if that is the case, then you have to solve the problem. Second, in the identification of causing leakage caused by the responsibility of the neighbors. In order to clarify the situation, damaged owners may ask the Housing Quality Inspection Department to identify the causes of water leakage and how to repair. Three is to see the house or not in the warranty period, because the general purchase of the new house waterproof warranty for 5 years
First dark shift + insert switch keypad and then press P do not need any settings ah
36KW electric heating tube rated current: I = P / 1.732 / U = 36 / 1.732 / 0.38 ≈ 55 (A) open should be ≥ 70A, contactor for the CJX2-. if the line is not long (≤ 30 meters) Root 10 square copper wire and a ≥ 2.5 square copper wire is zero; other load power is small, basically does not affect the balance of the three-phase.
I bought a set of wireless mouse keyboard, less than 100 dollars, are resolved.