Home > categories > Lights & Lighting > High Mast Lights > High pole construction plan or construction process?
Question:

High pole construction plan or construction process?

High pole construction plan or construction process?

Answer:

The bolt can be fixed by welding
The bolt can be fixed by welding. To be basically completed before the threading can be installed by debugging
Pour a good concrete and lay the embedded bolts.
Choose a good lamp samples, go to the green flower in front of the lighting shop to get the ground fixture and hole size drawings,
Generally using a concrete foundation, embedded bolts to solve

Share to: