Steel rails are typically installed by first laying down a foundation of wooden or concrete sleepers, which serve as a base for the rails. The rails are then aligned and secured to the sleepers using track fasteners. During installation, various specialized equipment such as cranes, track machines, and rail tamping machines are utilized to ensure proper alignment and stability. When it comes to replacing steel rails, the process involves removing the old rails by disconnecting them from the sleepers and track fasteners. This is often done using rail de-stressing equipment and rail pullers. Once the old rails are removed, new rails are brought in and aligned with precision using laser-guided technology. The new rails are then secured to the sleepers and track fasteners, ensuring a safe and smooth railway track.
Steel rails are installed by first preparing the track bed by leveling and aligning it. Next, the rails are laid on the track bed and secured with fasteners such as clips or spikes. The rails are then connected with joint bars to ensure a continuous track. During replacement, the old rails are removed by disconnecting them from the joint bars and fasteners. New rails are then placed in the same manner as installation, ensuring proper alignment and secure fastening.
Steel rails are installed by first preparing the track bed, which involves leveling the ground and compacting it. Then, the rails are laid out along the track bed and secured with fasteners. Finally, the rails are aligned and adjusted for proper alignment and gauge. When it comes to replacements, damaged or worn-out rails are removed by unfastening them from the track bed. New rails are then put in place, fastened securely, and aligned to ensure smooth train operations.

Share to: