How can a 10-ton electric block machine be installed
Easy to speak with you: first, the drum pad first flat, preferably two loading motor chain (only with a good chain installation) look at the site specific environment,
Some words to say with you not clear this is tricky Also dry for a long time experience, not bullheadedness is installed, a teacher has a master installation method.
First, the shaft of the motor shaft and the coupling on the drum (which is the most important step) are left to adjust the low and low of the motor screw. It is easier said than done. I wish you good luck