Home > categories > Construction & Real Estate > Geomembranes > How does the construction of the soft film ceiling?
Question:

How does the construction of the soft film ceiling?

nan

Answer:

1. First to go to the site to see if there is a condition of installing the keel: Look at the scene to make sure the wall is completed, and woodworking processing part is qualified, the area that need to be plastered should be completed first. First part plastering carpentry part we proposed must be in accordance with the requirements to do, to advance the processing of.2. entering the construction site conditions Licensor hole size lamp, air outlet, first part is fixed according to the design Aluminum Alloy keel keel carpentry requirements drawing well, attention must be right angle connecting to smooth, flat, dense.3. lamp holder, tuyere, light tube plate to and around the keel level, and firmly cannot swing can smooth.4. smoke, ceiling lamps, the first position to make a wooden frame, wooden frame the bottom surface should be polished, and pay attention to the level of height is too low, it is easy to show a trace of.5. before installing ceiling, carefully check the keel joints are solid and smooth, the spray head to stick on the white tape, an outlet should be well handled. When loading the smallpox to first from the middle to both sides of the fixed, while paying attention to size on both sides and pay attention to welding seam to the final straight angle position, pay attention to smooth. Around the well to the smallpox pruning removes. To perfect income effect on the edge. Turn on the light hole. To mark the position of the lamp hole , and carefully stick the PVC lamp ring carefully and accurately on the bottom of the soft film and then remove the excessive smallpox after it is firm. Find the position of the outlet and the light pipe handicap, just as the surroundings, to install the soft film to the aluminum alloy keel, pay attention to keep the angle be smooth.
The light frame, the outlet and the tube plate should be at the same level with the surrounding keel, and it should be solid and can't swing. Smoke, ceiling lamps, the first location to a wooden frame, wooden frame bottom surface to be polished and attention level height, too low to highlight the underframe. Install the ceiling before, carefully check the keel joint is firm and smooth, and the spray head to stick on the white tape, the air to. Install the ceiling must first from the middle to both sides of the fixed, also note that both sides size, pay attention to welding seam to the final straight angular position, pay attention to smooth. Around the smallpox pruning removes to achieve the perfect income side effect. The make of the lamp hole: To mark the position of the lamp hole , and carefully stick the PVC lamp ring carefully and accurately on the bottom of the soft film and then remove the excessive smallpox after it is firm. Find the position of the outlet and the light pipe handicap, just as the surroundings, to install the soft film to the aluminum alloy keel, pay attention to keep the angle be smooth.
1. The installation tools: The long and short blade, paper?knife, plaster tool, power supply line, ash blower, air gun, liquefied gas, glue. 2 The key points of construction: A. Before installing, there is a need to check the keel, light socket, sprinkler, tuyere, residues, and walls ready for installation. To check the power line, thread residue, the spray head wrapped well so as to prevent damage to the soft film. B. The installation of the light transmission film: Open the HID lamps and to see if its light is stable, and whether there is aberration. To check if the edge of the keel is light leakage, then clean up the wreckage to install the soft film. Try to avoid to make the soft film contact with dirt and dust. The whole process should be ensured clean and tidy. C. The installation of the soft membrane: To find the corresponding film, reasonablely heat it with jackhammers or hair dryer.

Share to: