I have a 6SE7042-1WN60 inverter, he contains the master and slave from the two devices in the connection from the main, because they do not understand the particularity of the fiber, like ordinary wire stripped of its sheath line about two centimeters. Will you: 1) What are the consequences of this practice? 2) how to remedy 3) then the fiber line in the end there are those requirements? Please reply as soon as possible. More
It is best to first under the good line, and then threading. As long as there is no connector does not have a junction box, try to calculate the required length of the wire, according to the actual length of the minimum one meter long. Try not to connect in the middle, there will be security risks. The pipe must pass into the junction box, otherwise it may not be able to thread the pipe when it is caught. Buy the line when the colleagues to buy 5 to 7 meters of steel, the need to wear the wire stripping skin 4 to 5 cm long, twisted together only to stay a long copper wire, the steel wire bent to the wire twisted steel Line elbow, and wrapped around with plastic tape. The wire will be drawn into the wire, you can pull out the wire. If the connector will be stripped of the wire about 6 cm, leaving the rest to keep up with the tight winding is not less than 5 laps. The extra cut will be the rest of the line bend back, with pliers and other lines pinch, hang tin, with plastic materials package first layer, and then cloth cloth cloth can be the second layer. (Specification requirements line need to hang tin, but home improvement is generally not)
Is the first cloth pvc pipe in the wire to pull the wire to pull the wire, wire tube wall better.
Does anyone know who can contact with those units or maintenance?
Oh, your problem is no need to copy, and can not copy. I think, since you have a basic operating procedures for water utilities do not understand, then I suggest you do not do their own, or find a water technician to do it for you Water workers live, are basically hidden works, is not sloppy, halfway in case of a problem, then to the final installation time will be difficult to solve. Moreover, want to be in this online to find a lot of problems, this possibility is certainly not big. I here on your question to ask a few points as follows: . the wire tube should be buried first, and finally a loop a loop to thread, and line. . threading generally requires two people partner, threading, is to use fine wire to pull the wire - from one end of the tube to the other end. . the location of the socket is based on the actual needs to determine, not the average way to install a few meters, and some can not have the wall. ☆ ☆ ☆ above answer, from Google know the team "decoration I know". If you have any questions, please continue to ask; if satisfied, please click on my answer below the "selected as a satisfactory answer" Thank you! ☆ ☆ ☆