Question:

How is the acceptance of tiles after construction?

How is the acceptance of tiles after construction?

Answer:

First knock! The sound is empty! Indicating that the cement did not wipe evenly. There is a place where there is leakage. In touch! Tile connection is smooth! If the tiles are not flat, it shows that the cement gray is not even! Look after! Tile joints should be horizontal and vertical.
Acceptance of several main parts: first within two meters of the error shall not be greater than 2mm, the joints should be neat, uniform size, no hollowing, not loose, with two meters long ruler or by the foot of acceptance. Second, you can use a small hammer in the ground or the walls of all the light tapping, no empty drums. Finally, pay attention to the drainage requirements of the floor tile slope should meet the drainage requirements, and ground leakage should be tightly integrated.