Answer:

You look happy or not the master machine
The material can be supplied and the ground floor is well disposed of. It will soon be 1 kilometers a night
As674278135 said very well, must see the teacher happy not happy, ha ha. The progress of the project, and many of the first factor, personnel deployment, management is second, all kinds of machines; the operation is normal; third, paving width and thickness; fourth, operation technology, mentality, and engineering supervision will be difficult; fifth, weather...... In general, water stable paving 10 hours a day by 30 cm thick 6 meters wide, 500 meters above the normal even laying asphalt; well, it's hard to say, up to 2--3 kilometers a day, everything is normal at least laying 1 kilometers, feeding to normal