Question:

How many meters is the first four eight dump trucks that can pull 70 tons of soil?

How many meters is the first four eight dump trucks that can pull 70 tons of soil?

Answer:

Tonnage can be calculated by themselves, first count how many cubic meters can be pulled, long * high * wide, and then multiplied by the density of soil, you can, the first four after eight, the largest 8 meters, about 5. 8.5*2.3*2 stands and then calculates the density of the soil, just OK
After the first four, eight of the dump truck power to more than 300 horsepower caixing.
After the first four, the maximum length of eight is 8-9 meters, to 8.5 meters long, 22.5 meters wide, 2 meters high, for example, 8.5*2.5*2, and then by the density of soil to calculate just fine
The first four eight dump trucks that can pull 70 tons of earth are 8 meters or so around 51, tonnage can be calculated by itself, long * high * wide, and then multiplied by the density of soil on it