equipment more server room recommended column head cabinet way, so that integrated wiring cable pool to the column cabinet, rather than the core cabinet, thus saving twisted pair and fiber.
placed a larger heat server such as IBM690, 670 and other server cabinets, the front of the cabin between the net distance should not be less than 2.1 meters, so as not to heat the heat density is too high to affect the equipment hea
rationally adjust the phase of the equipment into the room and the relative location of the expansion of equipment, it is necessary to meet the computer system process, but also to facilitate the future expansion of equipment into place and cable connection
host, storage devices, server cabinets should be partitioned, host, storage devices, server cabinets and UPS, air conditioners and other equipment should be set aside in accordance with product requirements maintenance space, allowing adjacent equipment, maintenance intervals partially overlap;