Question:

How to install ultrasonic vibrating screen mesh

How to install ultrasonic vibrating screen mesh

Answer:

1. Clean the net rack and clean the adhesive surface with a clean soft cloth dipped in acetone;2. Stretch the net ring on the clean surface. Place the screen to be installed on the screen ring. Lock the clamps so that the screen can be stretched flat on the ring;3. Support the grid in a vacant place. Mix it with KD-504A glue and then spread it evenly on the grid;4, the tension ring stable on the grid (Note: the Internet the stretching ring down on the grid above), the pressing block screw on the steady tension ring around the surrounding uniform stress, the frame glue on the penetration in the screen above, after the glue completely dry (in constant temperature environment, need solid dry 12 hours);5, first loosen screw pressing block, the stretching ring locking clamps loosen, with tension ring, can be used.
The ultrasonic is the installation of ultrasonic system based on the three dimension of the original rotary vibration sieves, so the installation screen is also ordinary and rotary vibration sieve is different. Removing the old network only need general rotary vibration sieve screen after installation, use the rubber ring is fixed on the screen in the new frame, then cut off the excess part OK. But the ultrasonic vibration sieve screen installed in more trouble. Because of its equipped with ultrasonic system, installed on the network when the use of the screen is a sticky net structure, and the ordinary rotary vibration sieve is different. First tooling will screen fixed to the ultrasonic net frame, the screen surface must be flat, there is tension then the screen are fixed, AB, after 12-24 hours after bonding will work out the extra handling, cut off the screen can be used. The advantages of using the installation screen is stuck to the network can effectively prevent the screen loosening caused by material The problem is not to be discharged after screening;
1, the steps are the same as above;2. Place the installed screen flat on the clean surface and place the rack on the screen. Notice: the direction of the grid the position of the transducer is upwards;3, beyond the screen edge grid from the grid to roll up and tighten, with instant glue (502 glue can) will roll up the screen in the back of the grid point stick, the tension in the grid on a flat screen;4. The sealing aprons are installed on the grid;5. The net rack is mounted on the sieve machine, pressing the upper frame and locking the bundle ring. (while tightening the tie ring nut, the rubber hammer is used to knock the circumference of the bundle ring evenly so that the force is evenly distributed), and the screen is pressed on the grid by the upper frame;In 6, the bonded surface uniform coating, glue and screen on your fingers, make the glue evenly dispersed, about 30 minutes in the glue again, after the glue completely dry can be used.

Share to: