How to stick marble stair steps
When the requirements of white cement and other colored cement jointing design, with white cement and paint similar plate tone colored cement slurry, with special tools to smooth compaction pointing.
Before the shop is stuck to the plate) premoistened dried standby, when paving will be placed in the four corners and plate shop with semi dry mortar layer, try to shop right after the turn on the back plate, with a layer of scraping the 0.5 water cement ratio of cement paste, and then gently plate Putie good alignment in situ, with a wooden hammer or rubber hammer plate to make the angle smooth, seam, on meet the design requirements, requirement of joint uniform, consistent color, surface layer and base firmly. Timely clean the surface layer of residual slurry, clean up the seam. Room temperature Putie end 12h 3D can start maintenance, pointing or wipe seam.
The stairs plate surface layer paving sequence is generally from the bottom to the top by paving, first paste facade, after paving the plane plate number number when paving should be tried together, try to spell paving.
Before the shop is stuck on each step elevation and plane plate, according to the pattern, color, texture mosaic trial spell, row, row number after try put aside.
1) according to the elevation control line, the error of each step of the stairs is divided equally, and the wall surface is set out to be marked as the check and control plate elevation and position standard.2) surface layer plate stairs material should first pick (steps selected to meet the demands of skid resistance, and put the spare bulk) by color and pattern classification, paving material should be considered before soaking wet, but the use of the surface should be dry.3) base of dirt, dust. Ash cleaning, such as local uneven, should be posted in the shop before the spit flat, concave with 1:3 cement mortar leveling.