Home > categories > Construction & Real Estate > Engineered Flooring > How to strengthen the composite floor?
Question:

How to strengthen the composite floor?

How to strengthen the composite floor?

Answer:

Reinforced wood flooring accessories installation requirements: 1. The bottom mat can prevent the floor by wetlands, and between the ground and the floor from the buffer effect. When the mat is installed, the mats and mats can not overlap, and the interface is sealed with tape. 2. Geothermal ground, the first floor and large shopping malls and other ground to add 0.2 mm thick film, and every two films should be overlapped every 200 mm, and sealed with a tight strip. 3. Electric heating The ground is recommended to use anti-aging, good thermal conductivity of the material as a mat, in the full improvement of flexibility and reduce noise at the same time, electrical insulation protection must be improved. {TodayHot} 4. The quality of the skirting board must also meet the national standard requirements. Pavement process requirements: 1. Before installing the floor, doors and door sets must be set to the appropriate height to ensure the installation of the floor. 2. The floor of the pavement, requiring seams tight, no significant difference between high and low, no obvious gap. 3. Determination of floor expansion and contraction must be adjustable width of the special pad to determine. 4. Construction, as far as possible to maximize the savings of materials. 5. When installing the skirting board, the height of the hole on the wall to be consistent, shall not damage the pipeline within the wall. 6. Requirements skirting board at both ends of the seam tight, highly consistent.
Straight shop
The first step before the installation of the door can check whether the opening freely, if not, you can go to the bottom of the door to a certain thickness, and then a layer of PVC on the ground floor film to play a better sound insulation, moisture effect. Note that the cushion laying method is at right angles to the floor. The second step in the corner of the first board placed the location of the first board, tongue and groove on the wall, with a wooden wedge leaving 10mm expansion joints. The third step by the wall of the line to install the last board, take a whole board, and the former tenon relative to the parallel placed on the wall side to stay 10mm crossed under the saw, installed to the end of the line, if the remaining sheet length 40cm, Can be used for the next line first. The fourth step from the beginning of the second line should be evenly coated with the floor of the special glue (the first line does not glue), when the board is loaded, with a wet cloth or plastic scraper in time to remove the glue removed. The fifth step with a hammer and wood last to gently knock down the floor cutting plant Cui Chen Chao board coupons timid. Step 6 After the first two lines, in a timely manner with a rope or ruler calibration. The seventh step to the last line, take a piece of the whole board, on the installed floor, up and down alignment, and then take another floor, on the board, one end of the wall, and then crossed, and along the line saw (Note: need to set aside 10mm expansion joints), that is, the required width of the floor. Step 8 to the last line of the board, the first put the last block, with special fasteners will be squeezed into the floor, the installation finished, to be 2 hours after the withdrawal of wood last. The first step in the installation of the floor if the pipe out of the need to open holes in the floor, the diameter of at least 10cmm larger than the diameter, saw the surface should be 45 degrees with the board angle.
Reinforced wood flooring accessories installation requirements: 1. The bottom mat can prevent the floor by wetlands, and between the ground and the floor from the buffer effect. When the mat is installed, the mats and mats can not overlap, and the interface is sealed with tape. 2. Geothermal ground, the first floor and large shopping malls and other ground to add 0.2 mm thick film, and every two films should be overlapped every 200 mm, and sealed with a tight strip. 3. Electric heating The ground is recommended to use anti-aging, good thermal conductivity of the material as a mat, in the full improvement of flexibility and reduce noise at the same time, electrical insulation protection must be improved. {TodayHot} 4. The quality of the skirting board must also meet the national standard requirements. Pavement process requirements: 1. Before installing the floor, doors and door sets must be set to the appropriate height to ensure the installation of the floor. 2. The floor of the pavement, requiring seams tight, no significant difference between high and low, no obvious gap. 3. The floor of the floor is determined by the special pad of adjustable width. 4. Construction, as far as possible to maximize the savings of materials. 5. When installing the skirting board, the height of the hole on the wall to be consistent, shall not damage the pipeline within the wall. 6. Requirements skirting board at both ends of the seam tight, highly consistent.

Share to: