In the construction project, the pile driver can not be reached. What should the supervisor do?

In the construction project, the pile driver can not be reached. What should the supervisor do?

Answer:

Stop piling. What's that pile of yours? Analyze the reason and see how much the pile is under pressure
Stop. Check cause. Geological prospecting and prospecting
Hold supervision meeting;Analysis reason;Take out the treatment plan.
Contact design and geological prospecting personnel to the scene examination, to determine the final plan.