If you really worry about load-bearing, then the best puzzle in the edge of the beam and the column, the same increase to the bar.
More formal property management company is a set of decoration process. Such as decoration before the renovation agreement to be submitted to the decoration drawings and decoration company's qualification certificate copy, for decoration workers access permit; remind the owner involved in the bathroom decoration can not damage the waterproof layer, do not arbitrarily change the drainage pipes, paint, And so easy to cause the block can not be directly discharged into the drainage pipe, decoration materials, wood and more to do the corresponding termite prevention treatment. Daily supervision pay attention to fire liability, decoration to reduce the need to reduce the need to start the time and clear, decoration garbage may not be stacked in the garbage, green belt or public facilities, timely clearance; renovation completed after the completion of acceptance, check whether the destruction of housing The main body, can not unauthorized water meter, meter, gas meter, with or without illegal construction.
New pavement is generally used when the light brick to separate, this partition on the load-bearing requirements are not great, but should pay attention to the new brick wall in the new wall and the old wall contact location plus bar (small steel Or coarse wire).