Direct mounting methodInstallation height is usually very low (2m) paste methodThe mixing with adhesive, glue in the back with the artificial sandstone tooth paste spatula, artificial sand rock in the line on the wall.From the bottom to install, dry, beautify the gap.
Draw a line on the wall.The wall of the embedded parts can be welded corner, main keel, keel, installed with metal pendant; do not use chemical anchor bolt embedded parts are installed in the main keel, then install keel, installation of artificial sandstone with metal pendant.
Sandstone relief installation method and steps of: a desired tool level, tape, electric drill, impact drill, knife, 10mm 8mm electric drill, impact drill, cross screwdriver, putty knife, pencil. Two: large relief installation steps (for concrete wall and 12cm thick brick wall above 1), first in the wall in quasi required installation position, to mark on the wall around and below; 2, lay in the lower level; 3, below the horizontal line installation wall about 3mm parallel with 10mm bit playing four holes about 8cm, deep; steel bar or screwdriver or other hard material inserted into the hole to lay in relief support; 4, the product will be flat on the ground, the lower part of wood should be used to prevent damage to the floor and lift support. In the relief surface with an electric drill 10mm drill hole, and then use the 12mm drill bit along the 8mm dig an expansion of the screw head of the contraction hole, you can expand the screw head. To use special screws (5), the hole should be considered to choose the surface of the product is relatively thick place, as well as the distribution of power, and relatively covert place punch. The number of screws should be determined according to the size of the product. 6, after a good many people need to drill, lift into required installation position (below support is inserted bar or screwdriver), a good help to adjust the parallel lines in the original product hole with 10mm drill into the wall; note: make a hole with a screw fixed (fixed with a diagonal form); 7, after the completion of installation for patching the original sealing agent will screw head.