Solid wood flooring installation needs a wooden keel, according to the traditional method, the fixed wooden keel to hammer drilling, a cork in the drilled holes, and nail fixed wooden keel, the biggest drawback of this method is the hammer drilling, hit the cement floor of the pipes and wires. If there is, and can be mixed with cement, there is an advantage of building rubber powder, that is, in the case of large errors in the floor, wooden keel can be mixed with cement on the leveling. Thank you for your help.
) according to the bomb line test shop, lumber core board in sapwood, down between the board and the board width is less than 1mm. After repeated adjustment of the number, according to the number of people living in the middle of the building around the shop. When the wall should be left to the pawnshop, a board wide vacancy, vacancy and hold the water into the wood floor, just began to end a tightening block of wood, the floor drain tight.
Nail base panel on wooden frame. The base panel can use wood splint or thick thick, and the splint edge and slats end all the needle in the wooden frame on line.(4) according to the size of each floor and the size of the room to determine the floor puzzle and play the line, usually in good format, herringbone pattern, ladder type, etc..
Make the floor clean and dry, and brushing two times waterproof coating;(2) according to the ground line, the frame is directly mounted on the wood frame. The square section of the wood frame body is 3Omm '40mm' or 4Omm '50mm, and the connection mode is a half groove button joint, and the nail joint is coated with a nail. After the impact drill bore holes in the wood frame and the ground, with the bolt fixed on the ground, and check whether the framework to maintain the level of.