If the building a total of 6 and a half, almost 7 layers, what is the use of building materials is better? Durable, such as how much steel, what type of cement, how to match? What drain? What wire? What should you pay attention to? Please provide me with a list of building materials and the precautions that should be taken from the building. Anxious!
The following is a brief description, it is recommended to find a nearby project to see if there is no intention of the drawings COPY a change (or on the infringing) wall pillar C30 beam C35 reinforced general beam of 18 to 20 of the three steel plate 12 spacing 200 enough for the stirrups 6 PCT can be spaced 200 encryption area to see their own bricklaying plaster general composite Portland cement 32
5 the main line of 6 square brand you look at the water pipe 7 layer of PVC can be recommended Hua plastic wire line DN20 also recommended Huasheng self-built housing in the countryside should pay attention to fire, also Do the foundation of the time do not forget to do a good job to control the pile foundation 7 layer of a super-flow pile can be as much as you see your building area and the earthquake level of the general level of a layer of about 300 square More than 30 pieces of pile to get a dozen about 18 meters (in fact, but also to see your soil, but generally 18 meters almost) the above description is actually nonsense 7 layer suggest you find a team to do you out of the material they do Labor and labor saving time of course you can not do it yourself
5 can be as early as early warning you look at their own house to build the room line sure Bought the sub-line BV2