Is it first fitted with marble windowsill or first fitted with aluminum windows?
Installation process:
1, positioning and crossed: according to the design requirements of the window under the box elevation, location, draw window plate elevation, position line.
2, check the embedded parts: find and crossed, check the installation of the sill plate installation of the embedded parts, whether to meet the design and installation of the connection structure requirements, if errors should be amended.
3, the installation of the bracket: the need to set up a sill plate bracket, the installation should be checked before the fixed bracket embedded parts, to confirm the elevation, the correct position, according to the design structure of the bracket installation.
4, marble sill board installation: according to the design requirements to find a good location, pre-installed, elevation, location, wall size to meet the requirements, seams smooth tight, fixed pieces, according to their fixed fixed fixed installation.
Install windows first in marble windowsill.
First install the windows, in the installation of marble windowsill, to make the junction, more compact, good-looking, from a practical point of view, you first install the windows, in the installation of marble, waterproof function will be better.