The following is the approximate process, the specific process recommendations or need to look at the construction site to do. Pellet to determine the location of the hanging point - and then drill holes - install the hanging bar - and then install the main hook - install the main keel - install the sub-hanging - install the vice keel - install gypsum board - After the work of the painter. Which in the packaging gypsum board to do before the concealment project acceptance. Mainly light alignment must be accurate
Product protection 1, light steel skeleton, cover panels and other ceiling materials stored in the admission, the use of the process should be strictly managed to ensure that no deformation, not moisture, no rust. 2, the decoration of the ceiling with the boom is strictly prohibited to do electromechanical pipelines, line hanging with; electromechanical pipelines, lines, such as contradiction with the ceiling boom position, subject to the project technical staff agreed to change, not free to change, move boom. 3, hanging on the keel banned the laying of electromechanical pipes, lines. 4, light steel frame and cover panel installation should pay attention to protect the roof of a variety of pipelines, light steel skeleton of the boom, keel is not allowed to be fixed in the ventilation pipes and other equipment pieces. 5, in order to protect the finished product, cover the panel must be installed in the shed pipe, test the water, insulation and all other processes after the acceptance. 6, set a person responsible for the protection of finished products and found that the protection of damaged facilities, to timely recovery. 7, the process of all the written use by the two sides signed by the recognition, by the next process operations and product protection at the same time the person in charge to confirm the signature, and save the process of handing over the written materials, the next operation to prevent the finished product contamination, damage or loss Direct responsibility for the protection of finished products on the protection of finished products, supervision, inspection responsibility.

Share to: