Question:

Light steel keel gypsum decorative board ceiling need to do what information

Light steel keel gypsum decorative board ceiling need to do what information

Answer:

07SJ507: light steel keel cloth gypsum board, cloth clean board wall and ceiling This Atlas applies to the new, alteration, expansion of industrial and civil construction of non-load-bearing wall, partition, frame structure filled with walls and ceiling The Light steel keel cloth Gypsum board partition, cloth clean board partition, according to the construction method is divided into light steel keel partition, veneer partition, and in the two practices on the basis of the combination of decorative wall. Light steel keel cloth gypsum board ceiling, accept the situation is divided into no human ceiling and master ceiling. Atlas for the use of cloth gypsum board, cloth clean board national key new product use, given the selection table and the relevant parts of the building structure, the preparation of the depth of the design staff to meet the direct reference and guide the construction and installation; Light steel keel system gives a different form of structural design, to facilitate the selection of engineering designers
Material accessories 1. Light steel skeleton sub-U-shaped skeleton and T-skeleton two, according to the load and not on the master. 2. Light steel skeleton main pieces for large, medium and small keel; accessories hanging pendant, connectors, hanging plug. 3. Spare parts: a boom. Flower blue screws. Nail. Self-tapping screws. {TodayHot} 4. According to the design can choose a variety of cover panels. Aluminum pressure or plastic pressure every bar, the material varieties. Specifications. Quality should meet the design requirements. 5. Binder: should be selected according to the performance of the main material, before use for bonding test.
Light steel keel gypsum board, is a combination of gypsum board and light steel keel, construction attention when the plate specifications, pull line correction, the installation of fixed to ensure that straight and straight.
The first is the material inspection, the main dragon, deputy dragon and gypsum board to report the supervision; the second to do the hidden acceptance of information, light steel keel ceiling hidden acceptance records; the third is the inspection approved, light steel keel ceiling inspection lot. Basically, these three, if the hydropower is your company to do, then the ceiling before the closure of hydropower information, including wire laying and wire and cable laying hidden and inspection batch information.