Light wall process? Construction process and main points?
first step:
Put the line, Yun board in place.
In the light partition board installation of the axis were up and down the shell out of the thick line, along the two lines placed the required number of plates.
Step 2: Install and follow the board.
According to the size of the wall size required to install the first block-based, and then according to the size of a good measurement with a saw to cut.
Step 3: Sizing.
After all the installation, first with the water brush wall of the convex groove, and then a special adhesive agent wiped in the wall of the convex groove and the floor within the baseline.
Light wall panels are installed.
The wall of the adhesive will be moved to the equipment to fight the position, stand up and down the baseline, with iron crowbar to board and board between the tight, so that the mortar polymer from the seam at the end, and finally with a wooden wedge Fix it.
Corrected and fixed.
With the inspection of flat, vertical 2 meters straight ruler correction, and then 6MM or 8mm steel plus construction glue fixed.