Lightning arrester, what is lightning arrester?
Before pouring, the garbage, soil, steel and other impurities in the formwork should be removed and checked. The cement mortar block and the plastic cushion block of the reinforcing steel bar shall be checked.
If wood formwork is used, water should be watered to damp the template. The cleaning of the column template shall be closed after the removal of debris and water.