Hot melt welding: when the plastic floor laying is completed, the use of plastic floor materials and the corresponding special electrode, according to the type of material to adjust the temperature of hot welding.
Cold welding: when the plastic floor laying is completed, the use of cold liquid, cream or cold welding to connect floor seam.
Seam stitching: plastic floor in the laying, the two floor edges overlap 20mm or so, and then cut with a knife, forming a dense seam.