Home > categories > Minerals & Metallurgy > Aluminum Foils > Polymer Clay and Petroleum Jelly on Foam?
Question:

Polymer Clay and Petroleum Jelly on Foam?

i'm gonig to be starting a mask project using Sculpey polymer clay and a foam headwould i be a good idea to put a light coat of petroleum jelly on the foam head before i start laying the clay on it?

Answer:

Only if it were of the above ground kit typeAny other type of pool, eg concrete, tile, would require time for the building materials to dry.
Sabby, we live interior the Pacific NW, submit our pool in June and take it down in Septemberit truly is 4 ft deep and is sixteen' in diameterthe biggest rate each year sounds like the waterIt takes $50-$one hundred to fill the darn factorWe then might desire to purchase PH stability, Chlorine (the two the ask your self granules and the floater pellets), the filters, and the sorting out kiti might say we spend around $30-40 according to summer season on those componentsIt would not take plenty to maintain it clean different than to attempt it on a regular basis and make optimistic the water is balancedin case you do no longer then you will finally end up scrubbing the backside and facets and super chlorinating the poolWe additionally turn the clear out on at nighti'm hoping this helpsappreciate!
No because even supposing you could get a pre-made pool delivered, the digging and filling would take longerYou'd need a fire hose or a water truck to make the pre-made above ground pool delivery work.
Yes, you could have a pool built within an hourThe pool would have to be above ground and not require any concrete, which takes days to try depending on the size of the pool.

Share to: