Polystyrene foam board in recent years, how the market situation
Suchen slurry full thickness of 2mm thick 20mm thick 1: 3 cement mortar leveling 80mm thick polystyrene board insulation layer (plain cement paste paste 3mm ~ 5mm thick) full shop diameter 1.2mm mesh 3/4 mesh (hole size of 20 * 20) steel wire width of 0.914m30 thick fine stone concrete (1: 2) cold base oil two Owens color tile roof structure: the structure layer
, Site bonding construction The new insulation decorative board is produced through the assembly line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing building energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing building energy Transformation of the preferred material
"The more dangerous part of the project safety management approach" to build quality [2009] No. 87 in the "four scaffolding project" is to carry out expert certification scaffolding: . set up a height of 50 meters and above floor-type steel scaffolding . erection of height of 150 meters and above the attachment of the overall and scaffolding upgrade scaffolding works. . the height of the body 20 long chun bandit bandits to see help color burst Ji Mie and above cantilevered scaffolding works. In principle, by the construction unit to prepare a special safety construction program, reported to the Ministry of Supervision after the initial examination of qualified, and then by the construction unit or general contracting units organized expert certification meeting, the cost of the construction side or the general contractor to pay.