Question:

Request a basket construction quota

Request a basket construction quota

Answer:

General calculation method: (1) according to the construction organization design, the selected number using basket basket, determine the shift number according to the construction period, select the unit according to the market rental price execution. (2) if there is no construction organization design, should be selected according to the number of actual basket, on the basis of the construction team to determine the number of single diary or visa
The use of construction basket wall repair and brushing the wall paint, how to calculate the cost of measures (experts). According to the actual situation, the selected quotations, such as scaffolding construction, construction measures should apply scaffolding quota items. Such as hanging basket construction, it should be calculated by the use of basket construction measures
At the same time, the two calculation methods need to take account of the entrance and exit fees of the basket machinery, mainly due to the cost of machinery import and export freight and the cost of hanging basket. At present, the basket rental price of 120 yuan / day or so, the field freight and basket opening and dismantling costs, the market price of 500 yuan / times, and ultimately agreed as a basis for settlement, this price is for reference only.

Share to: