Home > categories > Machinery & Equipment > Beverage Processing Machinery > Sealing operation procedure (panel operating instructions)
Question:

Sealing operation procedure (panel operating instructions)

Sealing operation procedure (panel operating instructions)

Answer:

Seal the handle to the maximum stroke, hold the pressure for 1 to 2 seconds, then slowly raise the handle and push it to the original position.
Pull out the lower mold skateboard, remove the plastic cup, into the final sealing plastic cup, another cycle.
(If the automatic sealing machine or automatic sealing machine, into the plastic cup, the lower mold skateboard will automatically enter), down the pressure of the next step,
When the hot plate reaches the predetermined temperature, the red thermostat indicator light (sealing machine at work, the heating device in the heating and insulation state constantly alternating, so the green and red lights are constantly alternating display, this is a normal phenomenon).
Turn on the power, turn on the power switch, the indicator light, set the thermostat to the predetermined temperature, then the green heating indicator light.

Share to: