Question:

Seeking for the safe construction scheme of mobile scaffolding!

For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!

Answer:

Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.
All kinds of scaffolding engineering construction programGeneral requirements for 5.2.1 scaffolding settings and use general requirements for scaffold framing and setting requirementsThe design of the frame of the scaffold shall take full account of the requirements for the use of the project, the various conditions and factors for its implementation, and shall comply with the following requirements:Frame dimensions
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.