Home > categories > Hydraulic & Pneumatic > Other Valves > Signal butterfly valve installation or other valve installation
Question:

Signal butterfly valve installation or other valve installation

The general signal valve installation, or other valve installation is not installed with the groove flange clamp hoop Yucca or direct way? What's the convenient way to install the following diagram? I don't understand. Neither groove, flange nor hoop. Thank you, sir!

Answer:

For clip type, the two flanges on the pipe are drawn with studs, and the middle is the butterfly valve
The blue one is the separate body, and the red one is the welded flange on the pipe. There is rubber on the valve body, and it can be sealed with flange. This is determined by the structure of the butterfly valve, usually DN150 of the small diameter butterfly valve are installed this way. It comes with flanges, but the prices are much higher. Small caliber general butterfly valve is generally used for low pressure, leakage requirements are not high, so rarely use its own flange. With flanges, it is generally used in petrochemical systems and has a much higher pressure level.
The installation of the signal valve is in accordance with GB50261-2005The 5.4.6 signal valve shall be installed on the pipe in front of the flow indicator, and shall not be less than 300mm from the flow indicator.The other valve control valve installation, specification, type and location of installation shall comply with the design requirements, the installation direction should be correct, control valve should be clean, no blockage, no leakage; the main control valve should be added headstock logo, the control valve cover shall be provided to indicate position of the mark in the position.1. The installation of the exhaust valve shall be carried out after the pressure test and the flushing of the system pipe. The exhaust valve shall be installed at the top of the water distribution dry pipe and the end of the distribution pipe, and no leakage shall be ensured.2, the valve flow direction should be consistent with the direction of flow in the water supply pipe, water inlet side of the filter is installed, and should be installed in the control valve; the adjustable valve should be installed horizontally, the valve cover should be upward; the proportional valve should be installed vertically: when the level of installation, the valve orifice hole single breath we should double down, breathing valve whose orifice should be in a horizontal position.3 other control valve should be installed to keep a certain distance, to facilitate maintenance and management, installation of multifunctional pump control valve itself with pressure gauge, pressure gauge should be installed in the adjacent parts; import should be prevented in the back before the installation or use of the filter with filter backflow preventer, backflow preventer at both ends the valve should be installed separately, and at least one end of the flexible joint should be installed;

Share to: