PE cable tube with the PE water pipe What is the difference, PE polyethylene
Method: trunking clean first, mainly brick slag, and then Qinshui wet, filled with mortar
Wall trunking is divided into two cases, one, in the building renovation project, by the construction unit according to the construction map of the local trunking chisel, in the repair of the first line of the wire tube fixed firmly, and then clean up the line The dust in the tank and the loose building materials, after the water spray, according to the trunking repair the amount of choice to use fine stone concrete or cement mortar layered filling; Second, in the home decoration, according to decorative drawings of water and electricity lines transformation, Caused by the part of the trunking, the pipeline can be fixed firmly, clean up the base, the use of gypsum to fill, so that the construction speed, and not prone to shrink cracks.
Is to take the wire, the network line, how to install, depends on your specific requirements, I can help you