Span 3 meters of the prefabricated plate can withstand much pressure
In general, it is 350Kg / ㎡ of factory, and 200Kg / ㎡ of residential office building.
This is generally dare not consider the students, first of all to determine the prefabricated board reinforcement, and then, and structural designers can support the next board support can withstand the maximum force is how much structural design instructions are generally explained, How much is the load, how much live is. The general plant now 350Kg / ㎡, residential office building, then 200Kg / ㎡, but also to the structural designer
The prefabricated board is the floor used in the early building. Prefabricated board, is the project to use the module or plate. Because it is processed in the factory after forming directly to the construction site for installation, so called prefabricated panels. Production of prefabricated panels, the first with a wooden nail made of hollow model, hollow part of the model in the cloth after the steel filled with hollow parts, and so dry after knocking to the board, the rest is the prefabricated plate. Prefabricated panels are useful in construction, such as cement boards covered by ditches on the road; cement boards on the roof are made of prefabricated panels.