State grid wind power is generally built in what position
1.1, high quality wind. The primary condition of the wind farm site must be rich in wind energy resources.
The annual average wind speed is above 5m/s, and the effective wind time at 30m height is above 6000h, which is suitable for the construction of large-scale wind farm when the effective wind energy density is above 240w/m^2.
The first consideration should be given to meteorological conditions and social conditions.