The outer hanging scaffold board 12 embedded parts embedded in the crack?
The outer hanging scaffold board 12 embedded parts embedded in the crack, because the outer hanging scaffold embedded generally should be buried in the beam, and checking of the beam.
Is the pre embedded parts installation (burial) component hidden in the works inside. Is placed in the structure of casting fittings, for masonry superstructure when the lap. In order to facilitate the installation of engineering equipment based on external fixation. Most embedded parts made of metal, such as steel or iron, can also be used in wood, plastic and other nonmetallic rigid materials.
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.