Now is the decoration, the original plan is the top of the room is to brush latex paint, but the foreman said the above between the prefabricated cracks are more obvious, made latex paint is also prone to cracks, it is strongly recommended to do gypsum board ceiling. The original top of the treatment method is: the original latex paint eradication, coated interface agent, approved scratch wall lining, painting primer, scraping paste cream, coated latex paint. Now from the scriptures
If you want to do the ceiling, the original top do not need to do any treatment, sweep clean on the line.
Made a gypsum board with a caulking tape to deal with the joints and then you can scratch the putty or directly on the latex paint
From the decoration of the professional point of view
Even if the consumption of human resources and resources are not expensive
No ceiling spray latex paint to do the effect is not ideal, because the original floor building is always uneven
Which lost the proper craftsmanship of the process, not to mention there will be a follow-up after the phenomenon of cracking
Now the strategy is true, support!
How much the current cost should not increase
At present, when making smallpox use space height
Should leave the original ceiling 80mm elevation for the appropriate, because this is the LED downlight installation height