Housing decoration before the real estate business done closed water test, all OK, and later their own decoration worried about water leakage, and made a waterproof, still do a closed water test, or good. Stay for half a year, the shower, the washing machine are normal use, did not find the water leakage, the day before yesterday to tell the floor there is a drop of water drip pasture heap stalemate lack of painting phenomenon, how is this going on? In the end how to check where the leakage? How to solve? More

Answer:

1. Bathroom leakage causes and maintenance methods: 1) bathroom leakage reasons: There are two reasons for the leakage of the bathroom, the first is the ground water seepage, the second is the upper and lower water pipes damaged water seepage. 2) how to determine the reasons for water leakage: ◆ to determine the ground water seepage method: as long as the ground water, there is leakage of water downstairs, the ground does not use water, downstairs do not ask for a small pile ; ◆ to determine the water pipe leakage method: the general water pipe leakage water, and there is continuity; to the floor drain, hand basin, sitting to pour water can determine the water pipe is no problem, if the bathroom for several days without water , But there is leakage of water, and the leakage of water is not reduced, that is, on the water pipe problem. 3) the ground floor leakage water maintenance methods (Note: as long as the water pipe is not bad, you can ensure that this method to solve the problem of ground water seepage): 1, the surface of the dust, oil, water and other treatment clean and keep the surface dry; 3, in the tile surface, tile joints, wall joints, root and other cement parts, spray through the type of waterproofing agent, must be sprayed evenly, if the tiles are filled with a sealant, need to draw a small groove with a knife; ; 4, to be waterproof after 9 dry (about 2 hours later), with the filling paste filled with all tile joints and damaged and defective parts, around the root and other weak links with caulking paste brushing reinforcement; 5, ground and Wall joints and pipe roots around the use of plastic mud to do waterproof side; 6, waterproof construction after 24 hours within the construction site can not be water. 100 million waterproof not only to provide you with a good product, but also free online for your advisory services.
This is a leak around the pipeline, if the pipeline is leaking, then the water will become drops into the water drops. If there is water leakage around the pipeline, there will be a watermark around the pipeline.
If the waterproofing has done very well, there are seepage downstairs, the project is larger, it is estimated that the pry open the floor, may be water pipe aging. The