Want to ask the steel structure workshop leakage, how to do? How do you do it?
Stay in good weather, arrange the construction personnel for roofing defective lock seam, fixed bolts, ventilator, air pipe parts for maintenance and reinforcement, it is necessary for the replacement, easy water area should be subject to side plate was improved.
In a heavy rain, on-site inspection records Water Leakage position, if the conditions can be used to view Water Leakage close status of elevator, combined with house design drawings, a detailed record of the status of Water Leakage; to stay outside after the rain stopped, the area near the roof on the view point of the situation, meet all kinds of defect parts, should be promptly recorded, also available camera file.
With high elasticity waterproof coating, special high strength waterproof suture polyester fabric is strengthened. After the film is solidified, a complete waterproof layer is formed, the bonding is firm, the high elasticity is maintained, and the waterproof and steam permeable is easy, and the construction is simple. With bass waterproof system for easy water leakage parts of waterproof construction, strengthen the treatment, can ensure that the roof is no longer leaking water, ten years quality insurance.