Home > categories > Mechanical Parts & Fabrication Services > Pumps > Water pump outlet valve sequence
Question:

Water pump outlet valve sequence

Water pump outlet valve sequence

Answer:

In order to prevent the generation of water hammer when the pump stops the damage to the rubber head, should be immediately set rubber head pump outlet, the gate valve and the check valve is not a very convincing reason to decide the order of habits in our hospital order rubber head, check valve, gate valve1. Check valve located in front of the pump, I do not know what the significance is too great to think of.2. The actual installation sequence shall be: soft fittings, check valves, gate valves. The pressure gauge is best installed on the water outlet of the pump, but it must be in front of the check valve.Reason: 1) the soft joint is used to reduce vibration. The connection between the pump and the piping system, of course.2) normal work, the gate valve is not operating, and the check valve is frequent action, so the probability of maintenance is larger, when the maintenance of the pump closed, the water outlet valve can be maintained without affecting the normal operation of the system.3) the pressure gauge is installed in the check valve, which can prevent the impact and damage of water hammer on the pressure gauge.
Design specifications detailed manual instructions, divided into two cases:1, pump water first check valve, suitable for small caliber pipeline, gate valve to protect the non-return valve, not damage function;2, pump water out of the first gate valve, check valve for large diameter pipe, at this point valve easy to open and close;The setting of the check valve is mainly to avoid the high reverse speed of the pump and the condition of the submerged pump house. Set in the suction port of the pump, then stop the pump water flow will still affect the pump. In addition, the pump suction should try to avoid installing too many pipe fittings, so that the pump can maintain sufficient cavitation margin.
To reduce the impact of vibration, noise and vibration on the valve, the soft connection is best at the pump outlet.The check valve is sometimes checked, so it is placed in front of the outlet valve so that the water can be checked out. I think the order should be: pump outlet, soft connection, check valve, gate valve (butterfly valve)

Share to: