Question:

Waterproof engineering should be arranged at what time to do the best?

Waterproof engineering should be arranged at what time to do the best?

Answer:

If it is home decoration in the kitchen and bathroom waterproofing is done after the water and acceptance, paste the wall tiles before doing.
If it is interior decoration, in the indoor civil engineering and buried after the completion of the dark tube, began to carry out the best.
If it is civil engineering to be completed after the main body, naturally dry, can be carried out! If it is decoration works, as long as the start can be carried out, the sooner the better, so that cross with other processes, resulting in problems!
Look at what material, the real cement-based infiltration of crystalline waterproof material twisted Fu Huang Piling a good standard pupil Paste can be done, we have an admixture directly into the concrete, the warranty for 25 years, do not have to do the time to do! what!